Abstract

D aqing o ilfield is in high water cut stage and always appears two phenomenon called "two speeds" and "two low". Based on the geological characteristics of the block, the current exploration wells arrangement and producing dynamics, two sets programs of water injection intensity and water injection timing were designed. Through the numerical simulation prediction of the two sets of 16 programs, the optimization results are 9 injection intensity and 93% of water cut. The cumulative oil producing capacity is 1402.41×104t and the cumulative increasing oil capacity is 6.26×104t and the increasing value of the recovery efficiency in Secondary oil layer is 1.33% when the water cut is 98%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.