Abstract

Construction organization design is an important technology economy file of guiding the project construction. The sectional area of auxiliary inclined shaft is 21.6m2, belongs to big section of long inclined shaft. Based on the geological condition, auxiliary inclined shaft in Hecaogou mine optimized the construction organization design and adopted four-eight cross recycling way. Thanks to the use of high-power EBZ318H comprehensive tunneling machine, it has realized the rapid construction of inclined well, achieved the good grades of 227 m in the highest month .The well had good engineering quality and no safety accidents, implementing the fast construction of safe and efficient, high quality, economic benefit and social benefit . At the same time, it had accumulated rich experience for big section of long inclined shaft construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.