Abstract
The QE Staffing and Scheduling Methods (QE Methods) were originally developed to optimize staffing and scheduling systems in seven day a week health care facilities, but the methods are applicable to all industries currently operating, or planning to operate, seven days a week.The driving force behind the efficacy of the QE Methods is the uniquely designed dynamic job sharing team partnerships that enable people to work less and produce more (more synergy). The QE Methods also create a uniquely new economically advanced work and leisure time culture, more quality and efficiency (QE), more and better products and services, more and better jobs, more economic growth and a better economy. They also solve unemployment problems, aging population problems, education system problems, and they help reduce our energy consumption and protect our environment in the process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.