Abstract
The design of a piston operated propane bubble chamber which has been used in conjunction with the 1 GeV proton beam of the Birmingham synchrotron is described. The operating conditions and the method of analysis of photographs are discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have