Abstract

The automated real time control of an electrical network is achieved through the estimation of its state using phasor measurement units. Given an undirected graph representing the network, we study the problem of finding the minimum number of phasor measurement units to place on the edges such that the graph is fully observed. This problem is also known as the Power Edge Set problem, a variant of the Power Dominating Set problem. It is naturally modeled using an iteration‐indexed binary linear program, whose size turns out to be too large for practical purposes. We use a fixed‐point argument to remove the iteration indices and obtain a more compact bilevel formulation. We then reformulate the latter to a single‐level mixed‐integer linear program, which performs better than the natural formulation. Lastly, we provide an algorithm that solves the bilevel program directly and much faster than a commercial solver can solve the previous models. We also discuss robust variants and extensions of the problem. © 2016 Wiley Periodicals, Inc. NETWORKS, Vol. 68(2), 104–120 2016

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.