Abstract

AbstractThe order scheduling and rack sequencing problem deals with the order picking process in robotic mobile fulfillment systems: automated guided vehicles lift and transport movable storage racks to picking stations to supply items requested by customer orders which are put together in cardboard boxes on a workbench of limited capacity. To efficiently operate the station, the sequence in which racks visit the station one after another and the intervals at which customer orders are scheduled must be coordinated. We present a dynamic programming algorithm for the order scheduling and rack sequencing problem at a single picking station minimizing the number of rack visits. Despite monolithic mixed integer linear programming formulations, our approach appears to be the first combinatorial solution method for the problem in literature. A computational study demonstrates the effectiveness of the approach.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.