Abstract

This article overviews the existing condition and the development perspectives for the electric power sector of Bosnia and Herzegovina (BiH) until 2020 [1]. Acknowledging the existing organisational structure of the electric power sector, an overview of electricity consumption projections is given per electric utility company, per entity and for Bosnia and Herzegovina as a whole. It is followed by descriptions of existing electric power (production) facilities, and the power plant candidates for construction in the following decade. An estimate of electricity export possibilities into neighbouring countries has also been made.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.