Abstract
This research presents a variation to the permutation flow shop problem where Just In Time (JIT) production requirements are taken into account. The model developed in this research employs dual objectives. In addition to the traditional objective of minimizing the production makespan, minimization of Miltenburg's material usage rate is also incorporated. In this model, multiple units of any product are permitted in the production sequence. However, the minimization of material usage rates attempts to prevent batch scheduling of products and allows unit flow of products as required in demand flow manufacturing. A solution method is proposed for determining an optimal production sequence via an efficient frontier approach and Simulated Annealing (SA). Test problems and specific performance criteria are used to assess the solutions generated by the proposed method. Experimental results presented in this paper show that the use of the efficient frontier and SA provide solutions that approach the optimal solution for the performance measures used in this research.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have