Abstract

Previous studies of statistical performance of Phase II simple linear profile approaches were reported only for the case of known profile parameters assumption. The main objective of this article is to evaluate and compare the performance of these approaches when the profile parameters are estimated from an in-control Phase I profile data set. Simulations establish that the performance of these approaches is strongly affected when the parameters are estimated compared to the known parameters case. The in-control performance of the competing approaches significantly deteriorates if estimated parameters are used with control limits intended for known parameters, especially when only a few Phase I samples are used to estimate the parameters. The results show also that some profile monitoring approaches need much larger number of Phase I profiles than other approaches to achieve the expected statistical performance. They also show that the profile monitoring approach proposed by Mahmoud et al. (2010) has generally better out-of-control run length performance than the competing approaches when the estimated parameters are used in the charts design.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.