Abstract

In order to learn more about the composite steel-concrete bridge which the Djoué bridge of Congo (Brazzaville) National Road One Phase- II Project has selected, promote the design technologies of bridges and better understand and improve the relevant standards, The overall optimization design analysis of Djoué Bridge aiming at saving steel and improving bearing capacity is necessary. The Doctor Bridge was used in optimization of bridge type, concrete thickness and height of steel beam and they have been selected. It can provide technical references for the construction of the Djoué Bridge, the follow-up study of the composite steel-concrete bridge and the specification improvement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call