Abstract
The real-time requirements of the data transmission for the power communication systems are very high, and the system protection demands the communication delay more stringent. The consequences of the malfunction or refusal of the grid control system caused by the communication delay are much more serious than those of other communications. Because the grid stability control system involves the entire system, the malfunction or refusal may lead the entire grid to be disassembled or collapsed. A new networking method is proposed based on the analysis of the existing power communication networking technology in this paper. And the delay of this new networking method is analyzed by analyzing the mechanism of the delay generation. So that the adaptability of the new networking method in the system protection communication networks is determined from the delay level. It is intended to provide the reference and guidance for the construction of a high-real-time system protection communication networks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.