Abstract
This paper summarizes the findings of the probabilistic risk assessment (PRA) for Unit 1 of the Grand Gulf Nuclear Station performed in support of NUREG-1150. The emphasis is on the “back-end” analyses, that is, the accident progression, source term, consequence analyses, and risk results obtained when the results of these analyses are combined with the accident frequency analysis. The offsite risk from internal initiating events was found to be quite low, both with respect to the safety goals and to the other plants analyzed in NUREG-1150. The offsite risk is dominated by short-term station blackout plant damage states. The long-term station blackout group and the anticipated transients without scram (ATWS) group contribute considerably less to risk. Transients in which the power conversion system is unavailable are very minor contributors to risk. The low values for risk can be attributed to low core damage frequency, good emergency response, and plant features that reduce the potential source term.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.