Abstract

This paper summarizes the findings of the probabilistic risk assessment (PRA) for Unit 1 of the Sequoyah Nuclear Plant performed in support of NUREG-1150. The emphasis is on the “back-end” analyses, that is, the accident progression, source term, and consequence analyses, and the risk results obtained when the results of these analyses are combined with the accident frequency analysis. The results of this PRA indicate that the offsite risk from internal initiating events at Sequoyah are quite low with respect to the safety goals. The containment appears likely to withstand the loads that might be placed upon it if the reactor vessel fails. A good portion of the risk, in this analysis, comes from initiating events which bypass the containment. These events are estimated to have a relatively low frequency of occurrence, but their consequences are quite large. Other events that contribute to offsite risk involve early containment failures that occur during degradation of the core or near the time of vessel breach. Considerable uncertainty is associated with the risk estimates produced in this analysis. Offsite risk from external initiating events was not included in this analysis.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call