Abstract

In the context of non-primary-based cooperation of Russia and China the innovation Project «New Angarstroy»: Baikal-Amur metallurgical super-combine, is being considered. It was developed as a key part of the new stage of industrialization in Russia, including of large scale Trans-Siberian and Baikal-Amur railway reconstruction. The project serves as an alternative to further increasing the exploitation of forest resources in the Baikal region, creating here new environmentally harmful cellulose and chemical plants and tourist hotels on Baikal. The project assumes the development of the largest metallurgy production of national and international scale, which will includes high-quality ferrous metallurgy of the full cycle and titanium-magnesium industry. The development of the Baikal ecological territory is assumed within the framework of the Lake-Temple subproject.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call