Abstract

The dynamic single-facility single-item lot size problem is addressed. The finite planning horizon is divided into several time periods. Although the total demand is assumed to be a fixed value, the distribution of this demand among the different periods is unknown. Therefore, for each period the demand can be chosen from a discrete set of values. For this reason, all the combinations of the demand vector yield a set of different scenarios. Moreover, we assume that the production/reorder and holding cost vectors can vary from one scenario to another. For each scenario, we consider as the objective function the sum of the production/reorder and the holding costs. The problem consists of determining all the Pareto-optimal or non-dominated production plans with respect to all scenarios. We propose a solution method based on a multiobjective branch and bound approach. Depending on whether shortages are considered or not, different upper bound sets are provided. Computational results on several randomly generated problems are reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.