Abstract
Abstract BLWT STU tunnel, which is currently in test mode, will in its two measuring sections allow to prepare measurements with laminar and turbulent wind flow. The front section will fulfill technical parameters of steady flow for testing sectional models and dynamically similar models. In the rear operating section it is necessary to reproduce correctly the roughness of the earth surface covering different terrain categories and to prepare boundary layer suitable for experimental testing. Article deals with the brief description of the preparation and testing laminar flow and boundary layer for the urban terrain, which was simulated with rough elements and barriers of different heights. The attention is focused in getting get at least 1 meter height of boundary layer, which allows to optimize scale similarity of model.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.