Abstract

Based on the detailed consideration of the dynamic characteristics of Static Var Compensator (SVC), the mathematical method for installing location and optimal capacity of SVC considering transient voltage security is proposed. Firstly, the trajectory sensitivity index is used to determine the key fault set and SVC candidate location. Then, transient voltage security constraint of the bus voltage is restored to 0.75pu within 1s and the bus voltage is restored to 0.9pu within 3s after remove fault, Finally, considering the transient voltage recovery characteristics and dynamic characteristics of SVC, the minimum of bus voltage deviation after fault removed and minimum of installtion capacity of SVC as objective function for hybrid optimal allocation model. The bus voltage and capacity of SVC are introduced as variables into the Crisscross Optimization Algorithm (CSO) for solving. The effectiveness of the proposed SVC installation location and capacity optimization method is verified by the time domain simulation of the IEEE39-bus system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.