Abstract

The paper presents two applications (software packages) in which the load-transfer method is used for axially loaded Kelly drilled bored piles and displacement ductile iron piles. In the first, the ultimate friction is related to the effective stress via the so-called β method. The β method is refined into three stages to cover the variety of soils typical of Central Europe. For the driven piles, a different approach is presented in which the ultimate shaft friction is related to the reference hammering time. The recorded hammering time profile is fed directly into the software based on the load-transfer method. Analyses of five loading tests are presented proving that the load transfer method in combination with the β method or the recorded hammering time profile is able to compute the load-displacement curve of both replacement and displacement piles with a reasonable accuracy in various geological conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.