Abstract

As part of the effort to increase the beam power of the Main Ring (MR) for fast extraction (FX) in J-PARC to 750 kW, five new septum magnets for FX (FX-septa) were installed in the MR in 2022. The most significant goal for the magnets was to achieve an extremely low leakage field in the circulating line. To realize the low leakage field, new pure iron duct-type magnetic shields were mounted in the circulating ducts of the two high-field FX-septa in 2022. In July 2022, we verified that the impact of the leakage field of all of the FX-septa on the 3-GeV circulating beam was below 10% of that of the previous FX-septa. We also measured the leakage field in the circulating ducts of the two high-field FX-septa with new shields in October 2022, and confirmed that the quadrupole field component was reduced to ≈1% of that of the previous high-field FX-septa.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call