Abstract

In order to guarantee the power grid operation under the premise of reliability and stability, acquire relative economic investment and operating cost, and adaptable to all kinds of change flexibly, this article improves the traditional generic algorithm by considering the various objective function and constraint condition. The improved algorithm can search and optimize according to mechanism for the survival of the fittest. It is especially suited for the optimization solution of integer variables. The application of the algorithm proposed to fifteen nodes system of a certain city and comparative experiments show that the algorithm has fast convergence speed and optimizing result. A comparative analysis of the optimizing project using improved generic algorithm and computational result using engineering computational method in practical grid planning yield the same results, this shows that the improved algorithm has better adaptability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.