Abstract

In the past decades, the critical chain scheduling and buffer management (CC/BM) methodology has gained widespread acceptance as an emerging project planning and control technique. This paper first presents six priority indices for selecting the optimal critical chain when more than one such chain is possible. Next, we examine four schedule generation schemes for rescheduling, along with two control actions (i.e., expediting work to shorten activity durations and adding emergency resources to bring forward activity start times) for repairing a critical chain schedule whenever activity delays cross the buffer threshold. The main results of our computational experiments include the non-negligible impact of different critical chain sequences on the project robustness measures, the appropriate level of feeding buffer sizes, and the trade-off between different reactive responses in relation to the cost factors or management preferences.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.