Abstract

The critical chain scheduling and buffer management (CC/BM) methodology has proven to be a favorable approach to schedule resource-constrained projects and to offer a valuable control tool for monitoring projects under uncertainty. The previous studies on CC/BM seem to have neglected the cost performance, which might render its wider applications to the modern economic activities that are mostly performed in a project way. This paper presents an improved CC/BM framework that allows additional resource allocation/reallocation to bring forward activity starting times based on cost and schedule stability criteria. In the planning phase, the decision is made concerning the regular resource availability period in order to minimize the expected resource costs. In the execution phase, a scheduled order repair method for rescheduling along with two reactive resource allocation procedures as the corrective action whenever delays are beyond a certain buffer threshold are presented and examined in order to exhibit a comprehensive project schedule/cost control system that is adaptive to the CC/BM management logic. Finally, our computational experiment demonstrates the benefits of the proposed reactive methods under different cost or availability parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.