Abstract

The application of Building Information Modeling can break the barrier between project owner and contractor. However, its application may cause an interest conflict between them. The conflict is focusing on the scramble for potential benefits brought by information asymmetry, and it may hinder the application of BIM in reverse. Focusing on information asymmetry, this research analyzed the interaction between BIM's promotion and project owner, contractor's interest game by combining Asymmetric Information theory and game theory. Based on the description of the interest conflict process, this research built a modified Principal-Agent model. By numerical analysis, it is proved that through BIM's effect of reducing information asymmetry in project, BIM's negative impact on contractor’s profit may let contractor refuse BIM's contract which will finally lead to the failure of BIM's promotion. Then, this research simulated the interest conflict by using the modified PA model. Through comparative analysis on the results, this research suggested: 1) project owners should choose BIM at proper stage but not the most advanced one, 2) contractor's effort cannot be ignored when promoting BIM, 3) variety of policies should be made in order to deal with specific problems when promoting BIM at different stages.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.