Abstract
in 2018, Badan Pengkajian dan Penerapan Teknologi (BPPT) has developed composite sluice for controlling flood goals. The integration of retention pond and composite sluice deemed necessary to be analyzed as the integrated system as a flood disaster mitigation effort. This study aims to give a brief overview of the suitable retention pond capacity, which is integrating with composite sluice as a flood prevention effort. The retention pond designed in this study requires rainfall data, land use data and topography map. This study method uses empirical formulation based on statistical parametric on hydrology analyze and hydraulic analyze as a basis of retention pond capacity calculation and composite sluice as flood controller. The result of this study are; the maximum flood discharge in 10 years return period is 103,28 m3/s, while the riverbed discharge capacity with 8 meters width is 68,29 m3/s. To prevent flooding the retention pond volume with capacity volume in 1.117.214,24 m3 has required. In sluice practical width calculation for the retention pond, the resulting amount is 28,70 meters. It takes 32 units of composite sluice if the current needs to be maintained. The side composite sluice width has obtained 1 meter while the total composite sluice building width with four units for the retention pond is 6,4 meters.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.