Abstract
The floor heave is one of the key issues of surrounding rock stability control during the deep well mining process. To solve the problem about floor heave occupying the most of roof and floor convergence deformation, the author analyzed the engineering geological conditions of broken surrounding rock and the floor heave features in PanEr Coal Mine East 2 mining area when it through the fault zone with high pressure. It pointed out that we should make full use of the reinforcement of the roof and laneway's side to limit the deformation of the floor, and make use of overbreak, prestressed anchor cable, bottom corner bolt, deep hole grouting and backfill as direct bottom control countermeasures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.