Abstract
In order to solve the problems of large deformation and difficult control of the soft rock roadway floor under the influence of high stress and mining stress superposition in Zhaogu mining area, this paper analyzes the stress environment and failure mechanism of the surrounding rock by means of on-site investigation, numerical simulation and on-site industrial test. It is considered that the floor heave of the soft rock roadway is the result of the joint action of the surrounding rock fracture development, poor lithology, cementation, low strength of the original support and high ground stress. The distribution characteristics of stress, displacement and plastic zone of surrounding rock in soft rock roadway under different stress and support mode are analyzed by numerical simulation. Based on the above analysis, the combined control technology of “prestressed grouting anchor cable + grouting anchor bolt + grouting behind the wall + floor reconstruction” is proposed to effectively control the occurrence of roadway floor. The data of monitoring verifies that the grouting bolt changes the structure of broken coal and rock mass on the floor and restrains the occurrence of floor heave.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.