Abstract
The effect of chloride on the stress corrosion crack (SCC) growth behaviour in low-alloy reactor pressure vessel steels was evaluated under simulated boiling water reactor conditions. In normal water chemistry environment, ppb-levels of chloride may result in fast SCC after rather short incubation periods of few hours. After moderate and short-term chloride transients, the SCC crack growth rates return to the same very low high-purity water values within few 100h. Potential long-term (memory) effects on SCC crack growth cannot be excluded after severe and prolonged chloride transients. The chloride tolerance for SCC in hydrogen water chemistry environment is much higher.
Accepted Version (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have