Abstract
This article builds a financial model for estimating the net present value of an Independent Power Project (IPP) based on specific Power Purchase Agreement (PPA) contractual conditions. Partial derivatives with respect to the Plant Load Factor (PLF), the benchmark heat rate, and the debt maturity are established. These partial derivatives provide an understanding of the sensitivity of the project viability to technical performance and debt maturity. Partial derivatives are also provided for the sensitivity of consumer gains to the above factors. Both these sets of partial derivatives provide an enhanced understanding of contractual conditions. A numerical illustration demonstrates that lengthening debt maturity can add considerable value to equity holders.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have