Abstract

AbstractVariable renewable energy sources, e.g. solar and wind power, require flexible management of energy sources to stabilize the power grid. Immediate changes in power generation and power usage is compensated for by the operation of hydropower plants. This subsequently leads to frequent flow fluctuations – hydropeaking downstream of the hydropower plant. This study examines the short-term impacts of hydropeaking of hydropower plants on the sediment transport using numerical morphodynamic model. The model is calibrated to field measurements and subjected to various hydropeaking scenarios on daily to sub-daily scale. Based on this study, the effect of hydropeaking of hydropower plant 23.42 km upstream of the studied river section would have negligible effect on the bedload transport in the studied cross section.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call