Abstract

The river crossing structures in case of failure, damage or improper hydraulics shaping can be the source of a disaster risk. In this article, the result of modelling on problems of two structures is presented which are located on the Tisza section between the Hungarian border and the mouth. The Dam of Novi Becej in case of normal operation does not cause unbeneficial water level heightening or does not cause a harmful low water situation; nevertheless if failure or deliberate damage occurs, it can cause significant problems both in the low and high water periods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.