Abstract
The crack control of the thin-walled high pier for SanBei Bridge is effected by various uncertain factors such as loads, concrete strength and the release of hydration heat etc. Because of the fuzziness for the crack control of thin-walled high pier, it is difficult to accurately calculate the crack width to meet with the requirement of the limiting crack design for the structure. Based on the maximal permit crack formula issued in Concrete Design Specifications, the fuzziness analysis is made to the crack control reliability, the index of fuzzy reliable degrees of the girder maximal permit crack width is calculated by Monte Carlo method, and the sensitivity analysis to uncertain parameters is given to provide reference of the design for SanBei Bridge.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.