Abstract

The crack control of the concrete super wide box girder for New Jiujiang Changjiang River Bridge is effected by various uncertain factors such as loads, concrete strength and the release of hydration heat etc. Because of the fuzziness for the crack control of the super wide box girder, it is difficult to accurately calculate the crack width to meet with the requirement of the limiting crack design for the structure. Based on the maximal permit crack formula issued in “Concrete Design Specifications”, the fuzziness analysis is made to the crack control reliability, the index of fuzzy reliable degrees of the girder maximal permit crack width is calculated by Monte Carlo method, and the sensitivity analysis to uncertain parameters is given to provide reference of the design for River-Crossing Bridge.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call