Abstract

A vision for a long-term scientific and technological development for Tore Supra is highlighted in this paper. The proposed Tore Supra developments aim at consolidating the physics and technology of continuous tokamak operation on the route toward the development of a fusion reactor. This ambitious programmatic vision requires a significant power upgrade of the rf heating and current drive systems to operate Tore Supra up to the 20-MW power level in the long-pulse regime, i.e., at a convected heat flux up to 10 MW/m2 on the actively cooled plasma-facing components. This would allow an ambitious exploration of physics and technology issues of continuous tokamak operation in synergy with the stellarator program.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.