Abstract

Carbon Capture and Storage (CCS) is essential to achieve global cumulative CO2 reductions to meet the two degree scenario in 2050. To accelerate the development of CCS technology in China, the biggest full chain demonstration project is under construction in Guoneng Jinjie Power plant. This facility is designed to capture 150,000 tons of CO2 per year from coal fired PC boiler flue gas for EOR. The advanced amine absorbents combined with the integrated processes such as inter-cooling, rich solution split process and Mechanical Vapor Recompression flashing (MVR flashing) were used to reduce the energy penalty and operating costs. The system can attain following parameters including the CO2 capture rate>90%, captured CO2 purity>99% and regeneration energy penalty <2.4GJ/tCO2.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.