Abstract
The scheme of the high power boiler- house with cogeneration heat pumping plants for the two-tube system of heat supply is proposed. The application of cogeneration heat pumping technology without production of goods electrical power provides for the considerable economy of gas and increases the reliability of heat supply.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have