Abstract
:The downhole tubes were fractured and perforated after 5 years of shut-in due to high water cuts. This study employs a comprehensive array of analytical techniques to investigate the mechanisms behind fractures and perforations. Utilizing non-destructive testing (NDT), direct reading spectrometer, tensile strength testing machine, impact testing machine, optical microscope (OM), macroscopic fracture morphology observation, scanning electron microscope (SEM) and energy spectrum analysis (EDS), and sulfide stress corrosion cracking (SSCC) was studied. The reason for the fracture of the tubing is that under the condition of low pH value, high hydrogen sulfide environment, the tubing is fractured due to stress concentration caused by cracks in the outer thread relief groove. The perforation of the inner tube wall was caused by gradual wall thickness reduction under the influence of H2S, CO2, and Cl−, resulting in fouling and eventual perforation. To prevent tube corrosion during long-term shut-in, it is recommended to inject crude oil or diesel into the well.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.