Abstract

We report on the ATLAS commissioning run from the view point of the Thin Gap Chamber (TGC), which is the ATLAS end cap muon trigger detector. All the TGC sectors with on-detector electronics are going to be installed to the ATLAS cavern by the end of September 2007. To integrate all sub-detectors before the physics run starting from early 2008, the global commissioning run together with other sub-detectors has been performed from June 2007. We have evaluated the performance of the complete trigger chain of the TGC electronics and provide the trigger signal using cosmic-ray to the sub-systems in the global run environment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.