Abstract

This paper presents the status of the design and of the development programme of the two test blanket systems (TBSs) based on the blanket concepts supported by the EU, namely the helium cooled lithium lead (HCLL) and helium cooled pebble bed (HCPB) concepts. Both the test blanket modules (TBMs) box design and the associated systems (Helium Cooling Systems, PbLi loop for the HCLL system, helium processing systems for tritium extraction, etc.) have been revised and, where needed, modified according to the assumption that one ITER equatorial port could be available for testing the two European test blanket modules (TBMs). According to EU TBMs programme, two reliable test blanket systems shall be ready for installation on the first day of ITER operation. In order to comply with this ambitious objective, six EURATOM associates who have sustained the TBM program so far have joined themselves in a consortium aiming to ensure an efficient management of the project tasks and exploit specific competences enhancing potential synergies. The consortium objectives and development programme are summarised in the paper.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.