Abstract

Our current engineering pricing mode and management method still is not standard, the coexistence about all kinds of the engineering pricing method, especially the large problem of pricing method of private project. Our existing engineering pricing also has many unreasonable places in the program, which makes our engineering pricing has become one of the most important channels of Human intervention and corruption. These problems also make a serious distortion of our engineering cost, the "three over" (budget estimates more than estimates, the budget more than estimate, the account more than budget ) is a serious problem. Through a comparative study we can be seen that the bidding is the basic method of the engineering pricing, bidding method is only an auxiliary. But during the use of bidding for engineering pricing, only have the principles and legal in general which is not enough, also need to develop the bidding corresponding management methods and strict management of Engineering bidding. In fact, the project bidding management is one of the important contents during project cost management system.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call