Abstract

The paper is in the context of a plate milling system in Baosteel. Extracting the rolling data of plate, and according to the different order of plates out-stove, by determining the contiguous plates out-stove time interval and calculating the rolling time, we could judge the arrangement plan of manufacture plan in a roll changing period to achieve optimize mill pacing. On this basis, the paper puts forward a calculation method of the contiguous plates out-stove time, and proposes a series of suggestions to optimize the manufacture plan. It provides helpful practical experience to the mill pacing research.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.