Abstract

Public-Private Partnership (PPP) has been promoted as an alternative procurement method to provide public services. In recent years, several studies have been carried out in order to identify and assess the critical success factors (CSFs) of PPP projects. However, the interrelation between success criteria (SC) and CSFs in PPP projects has not received attention from researchers. To fill this gap, this paper intended to evaluate the effects of CSFs on the success of PPP projects using PLS-SEM. To this end, SC were monitored throughout construction, operation, and final transfer stages, whereas CSFs were taken into account during the procurement stage of the PPP project. Then, based on an opinion survey in Iran, the effects of CSFs on the success of PPP projects were evaluated based on the developed PLS-SEM model. Moreover, in order to validate the proposed model, two national highway projects in Iran were studied in detail. The results confirmed the effect of CSF on project success and showed that private sector capability has a direct effect on project success during the construction period and government capability is very effective during the project operation stage. In addition, investigating the case studies with respect to the introduced model indicated that a transparent bidding process, risk allocation, and good partnering are among the CSFs in PPP projects in developing countries.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.