Abstract

In this work the uncapacitated dynamic lot-sizing problem is considered. Demands are deterministic and production costs consist of convex costs that arise from economic production functions plus set-up costs. We formulate the problem as a mixed integer, non-linear programming problem and obtain structural results which are used to construct a forward dynamic-programming algorithm that obtains the optimal solution in polynomial time. For positive setup costs, the generic approaches are found to be prohibitively time-consuming; therefore we focus on approximate solution methods. The forward DP algorithm is modified via the conjunctive use of three rules for solution generation. Additionally, we propose six heuristics. Two of these are single-stepSilver–Meal and EOQ heuristics for the classical lot-sizing problem. The third is a variant of the Wagner–Whitin algorithm. The remaining three heuristics are two-step hybrids that improve on the initial solutions of the first three by exploiting the structural properties of optimal production subplans. The proposed algorithms are evaluated by an extensive numerical study. The two-step Wagner–Whitin algorithm turns out to be the best heuristic.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call