Abstract

The use of modern building materials in organizing the production of finishing works makes it possible to avoid shrinkage cracks in the finishing layer, to regulate the humidity conditions indoors, to increase the sound and heat insulation properties of the walls. In this connection, in the process of finishing work, the question about the selection of the necessary dry building mixtures, the diversity of which is also confirmed normatively, arises. The article proposes a method for the automated selection and calculation of the dry building mixtures consumption during the finishing work production organization by creating an algorithm described using the Dynamo visual programming tool. The functionality of the developed software scenario and the interaction of a bunch of Revit and Dynamo programs are presented. The sequence of user work with a software script is described. The proposed script can be used by architects and designers.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call