Abstract

On 5–6 July 2017, an unstable atmospheric condition caused an unusual concentration of rainfall above the Northern part of Kyushu Island, triggering a set of hydro-meteorological hazards. Within the affected area, the mountainous subwatershed of the Akatani River was significantly impacted by numerous landslides combined with debris flow and floods. National and local agencies deployed a plan of reconstruction to restore the floodplain and protect inhabitants. Regarding the hydrosystem in the Akatani watershed, this reconstruction project mainly focuses on the restoration of damaged protection systems and the construction of new infrastructures. Thus, this paper aims to explain the restoration plan of the Akatani River in terms of the strategic Japanese River System Sabo and then as a model of a national-scale spatial plan. It draws on (i) a literature review based on the historical evolution of Japanese protection systems and the River Sabo System; (ii) field surveys in 2019, 2022 and 2023, in conjunction with (iii) interviews with local, regional, and national officials; and (iv) a Geographical Information System analysis of previously and newly built protection systems through aerial photograph interpretation and geospatial data. Sabo works implemented in the Akatani watershed illustrate the engineering vision of Japanese river management. They also constitute a comprehensive system and include a downstream–upstream logic which echoes that of the River System Sabo. In addition, the disaster of July 2017 and the government’s response emphasize the continuous adaptation and improvement of the Japanese disaster management system, which mitigates severe disasters.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call