Abstract

The synergies of the Building Information Modelling (BIM) process and green building assessment tools (GBATs) like the Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST) known as green BIM, ensure that information is accurately exchanged during the green building design (GBD) practices. However, the issue of poor Information Exchange synthesis persists due to the lack of a standard model for green BIM implementation. Therefore, this study aims to develop the BIM-MyCREST Process Model (BMPM) for the concept design of green buildings. To actualize the research aim, an in-depth interview was conducted with 10 construction experts. Using the narrative analysis technique, the interview data were analyzed to identify the incidents that take place during the BIM process execution in GBD practices. With reference to MyCREST Guide, BIM standards; and the use of Integrated DEFinition (IDEF) language (IDEF0 and IDEF3), the BMPM was explicitly coordinated following the narratives of the interviewees. The developed BMPM will enable the multi-disciplinary GBD team to use the diverse domain BIM software to exchange accurate information and make critical decisions during the design of green buildings; thereby developing a building with high sustainability performance and accomplishing the business and commercial objectives of the MyCREST rating.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call