Abstract

In the application of the Indonesian Low-Speed Tunnel (ILST), the control of wind tunnel operations can determine the validity of the data and the number of tests achieved daily. The current operation control mechanism is still done manually and separately with one series of measurements for one test model configuration, inefficient human resources, acquisition of data that can be different, and the cost of using electric power is quite expensive. Therefore, this research and development activity proposes a wind tunnel automatic operation control system that integrates several plant facilities and ILST data acquisition based on Human Machine Interface (HMI) with the Waterfall method, using SCADA software and PLC. This aims to improve wind tunnel operation in one measurement series for multiple test model configurations with high data acquisition accuracy, faster and easier operation to reduce operating costs. This automatic operation control can increase operation time two times faster and 61% cheaper than manual operation. The design results will be used at the implementation stage in aerodynamic model testing.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.