Abstract

Fault fracture zone with rich water has some bad geological conditions such as low strength, deformation, strong water permeability, poor water resistance. Landslide has been happened because the water permeability. This paper is based on Yan-jia Tunnel in HuBei-Guzhu Highway. For the bad geological conditions, WSS is taken as the advanced support method to reinforce soil and stop watering. The method has improved the construction condition. To reduce the excavation area in one time and the disturbance to surrounding soil, the construction method of meshshotcreting firstly is adopted. The paper also do the numerical simulation with the numerical calculation tool of the software ABAQUS. The result is basically consistent with the field measurements, which has significance on the subsequent design and construction of underground projects with similar geological conditions

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.