Abstract

Based on the dynamic monitoring project of one underpass in Dalian, this paper tries to validate the control effect of the ground settlement on the stability of tunnel surrounding rocks during construction of underground passage under urban arterial road by means of analyzing the vertical ground settlement curves, convergence curves of tunnel inner perimeter and vault displacement curves. With the numerical calculation tool of the software FLAC, it also analyzes the construction of XS-2 # cross-section which was in the south side of the whole construction section at different stages by adopting the plane-strain model. Therefore, we can get the influence curves of ground settlement under different construction stages with considering the release of stress. The simulation results are basically consistent with the measured data, which has a great significance for the subsequent design and construction of underground projects with similar geological conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.