Abstract

The article discusses the causes of discrepancies in the values of the pile load capacity based on the results of calculations made on the basis of existing regulations and the pile load capacity after static load test on the construction site. A brief overview of the causes of discrepancies in analytical and practical values ​​of pile load capacity is provided in the article. The possible ways to solve this problem are suggested, namely, the development of the methods of analytical calculations of pile load capacity and the improvement of embedding technical processes. There is an example of such a discrepancy in the construction of a residential complex in Saint-Petersburg presented in the article. It was found that the variation in the results is not caused by the imperfections in the method of calculations, but by the infringements of construction technology. The article provides recommendations to minimize the discrepancies between the calculated and actual values of pile load capacity.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call