Abstract

The construction geological condition is complex in the transition section from the inclined shaft to the main hole. There are two kinds of construction schemes. After the comparison of the advantages and disadvantages of the two different construction schemes, it has selected the construction scheme of the rectangular pilot tunnel vertical to the main hole. This paper solve the construction problem of the transition section from the inclined shaft to the main hole of large cross section tunnel of passenger dedicated line under complicated geological conditions. According to the previous research results, the method can be used to large-cross section tunnel. The scaffold design and auxiliary construction measures is detailed. Compared with the expected duration, it completed the transition construction ahead of time with the speed superior to the ones of other similar works, and forming a safe and efficient construction situation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call